600.436 High-Assurance Systems
Fall 01/Operational Assurance
10
IGS Procedures
¨The developer shall document procedures necessary for the secure installation, generation, and start-up of the TOE
–describe the steps necessary for secure installation, generation, and start-up of the TOE