¨Goals of
Installation, Generation and Startup are to
ensure that the TOE has been installed, generated,
and started up in a secure manner as intended by
the developer
–i.e., a secure transition from the TOE's implementation representation being under configuration control to its initial operation in the user environment
¨Two Components,
levelled on the basis of whether the TOE
generation options are logged
–Installation
Generation and Start-up (IGS) Procedures
–Generation Log