 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
¨ |
Goal
of CM Scope is to:
|
|
|
|
– |
ensure
that the TOE implementation representation is tracked;
|
|
|
– |
ensure
that all necessary documentation, including problem
|
|
|
|
reports,
are tracked during development and operation;
|
|
|
|
– |
ensure
that configuration options (e.g. compiler switches) are
|
|
|
tracked;
and
|
|
|
|
– |
ensure
that development tools are tracked.
|
|
|
¨ |
Three
Components, levelled on the basis of what
|
|
|
information
is beingtracked by the CM system
|
|
|
|
– |
TOE
CM Coverage
|
|
|
|
– |
Problem
Tracking CM Coverage
|
|
|
|
– |
Development
Tools CM Coverage
|
|