 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
¨ |
Goal
of Life Cycle Definition is to provide
|
|
|
|
effective
(management) control over the system
|
|
|
engineering
process used to develop the TOE
|
|
|
¨ |
Three
Components, levelled on the basis of
|
|
|
|
increasing
requirements for standardisation and
|
|
|
|
measurability
of the life-cycle model, and for
|
|
|
|
compliance
with that model
|
|
|
|
– |
Developer
Defined Life-cycle Model
|
|
|
|
– |
Standardized
Life-cycle Model
|
|
|
|
– |
Measurable
Life-cycle Model
|
|