600.436 High-Assurance Systems
Fall 01/Development Process Assurance
12
Generation Support and Acceptance
¨Developer shall use a CM system
–Shall support generation of the TOE
¨Developer shall provide CM documentation
–(In addition to configuration list and CM Plan) shall include an acceptance plan that describes the procedures used to accept modified or newly created configuration items as part of the TOE.