|
|
|
|
|
|
|
|
|
|
¨ |
The
“sanitized” report issued by an
|
|
|
|
Evaluation
Scheme that:
|
|
|
|
– |
Documents
the Scheme verdict about whether
|
|
|
|
the
TOE meets the ST
|
|
|
|
– |
Confirms
that the evaluation was conducted in
|
|
|
accordance
with the Scheme policies and
|
|
|
|
procedure
(and by extension the CEM)
|
|