600.436 High-Assurance Systems
Fall 01/PCMS Exercise
3
Items of Interest(?)
¨Key ideas:
–Most info in a CM system is “frozen” (never modified)
–Really, only “branches” and “projects” need to be mutable
–Name frozen stuff with cryptographic hash
–Name modifiable stuff with Swiss numbers
–Use crypto for authentication, access control
¨Exploration of interaction between crypto capabilities and wide-area replication